ForelandSignal · career intelligence

SignalProjectsRiyadh → King Salman Park Infrastructure Phase 2 & Operations Building

King Salman Park Infrastructure Phase 2 & Operations Building

Phase 2 infrastructure package and completion of the core Operations and Maintenance Building.

Grounds of the former Riyadh Air Base, Riyadh (17.2 sq km master site), Riyadh, Saudi Arabia

Delivery chain

Owner · medium attribution

King Salman Park Foundation (KSPF)

Main contractor · medium attribution

Haif Company

Hiring and mobilisation news

Who is hiring on this project

Signal follows the delivery chain into the hiring: which of these companies are staffing up, which roles are open now, and who to reach. Role detail, application routes and named contacts are part of the product, not the public page.

See who is hiring here

Sources

“King Salman Park (Riyadh)”
parsons.com · chatbot.parsons.com · 26 Aug 2026 · strong confidence
“Contractor Haif Company commenced construction on the SR1.8 billion ($480 million) Phase 2 infrastructure package (covering earthworks, roads, landscaping, low/medium voltage networks, potable water, stormwater, and district cooling networks).”
spa.gov.sa · spa.gov.sa · 26 Aug 2026 · medium confidence

Also in Riyadh

Signal builds this page from public sources, automatically. Every statement above is shown with the source it came from and the date it was checked. Verify important information before applying or contacting anyone. If something here is wrong or out of date, write to corrections@saudijobradar.com and we will correct or withdraw the page.